Now showing items 1-2 of 2

  • Effective feedback of whole-life data to the design process. 

    Kishk, Mohammed; Al-Hajj, Assem; Pollock, Robert; Aouad, Ghassan (Glasgow Caledonian University, School of the Built & Natural Environment, 2003)
    KISHK, M., AL-HAJJ, A., POLLOCK, R. and AOUAD, G., 2003. Effective feedback of whole-life data to the design process. Journal of Financial Management of Property and Construction, 8(2), pp. 89-98
    Key activities of the implementation of whole-life costing (WLC) as a management tool during the occupancy stage are outlined. Then, the logic of a novel whole-life management approach is designed around two recently ...
  • Handling uncertain information in whole-life costing: a comparative study 

    Kishk, Mohammed; Al-Hajj, Assem; Pollock, Robert (Palgrave MacMillan Ltd. http://dx.doi.org/10.1057/palgrave.rm.8240126, 2002-07)
    KISHK, M., AL-HAJJ, A. and POLLOCK, R., 2002. Handling uncertain information in whole-life costing: a comparative study. Risk Management: An International Journal, 4(3), pp. 59-70
    A number of recently developed algorithms to handle uncertain information in whole life costing (WLC) are explained and validated in the context of two example applications. In the first example application, the proposed ...